13_tyn.jpg

load-bearing structure:two steel trussed arches in the main span, steel truss in adjacent spans, lower steel-concrete bridge deck
length:92 m
investor:město Ostrava
commissioning:2002


load-bearing structure:two steel trusses (simple spans) with lower composite steel-concrete bridge deck
length:2 × 60 m
investor:the Town of Týn nad Vltavou
commissioning:1998