02_litol.jpg

load-bearing structure:steel beam, whose central span is stiffened with an arch; lower composite bridge deck
lenght:120 m
weight of the steel structure:710 t
investor:ŘSD (The Road and Motorway Directorate)
commissioning:2011

The bridge received the award Construction of the Year 2014 in South Moravian Region.


load-bearing structure:steel beam stiffened with an arch; lower composite bridge deck
length:55 m
weight of the steel structure:168 t
investor:Středočeský kraj (Central Bohemian Region)
commissioning:2008


load-bearing structure:steel concrete composite beam with the upper reinforced concrete deck
length:583 m
weight of the steel structure:187 t
investor:ŘSD (The Road and Motorway Directorate)
commissioning:2007


load-bearing structure:composite steel concrete beam of box section; upper reinforced concrete bridge deck
délka NK:411 m
hmotnost OK:187 t
investor:ŘSD (The Road and Motorway Directorate)
uvedení do provozu:2006

The bridge received the award Bridge Structure of the Year 2008 in the Czech Republic


load-bearing structure:composite beam, whose central span is stiffened with an arch; lower composite bridge deck
length:201 m
weight of the steel structure:857 t
investor:ŘSD (The Road and Motorway Directorate)
commissioning:2001

The bridge received the award Bridge Structure of the Year 2001 in the CR.


load-bearing structure:steel beam reinforced with trusswork; lower bridge deck
length:111 m
weight of the steel structure:187 t
investor:ŘSD (The Road and Motorway Directorate)
commissioning:1999

The bridge received the award Bridge Structure of the Year 1999 in the Czech Republic.