06_krasikov.jpg

load-bearing structure:rigid beam stiffened with an arch
length:63 m
weight of the steel structure:580 t
investor:SŽDC, s.o. (The Railway Infrastructure Administration)
commissioning:2010


load-bearing structure:steel trussed structure coupled to the reinforced concrete bridge deck
lenght:29 m
weight of the steel structure:52 t
investor:SŽDC, s.o. (The Railway Infrastructure Administration)
commissioning:2009


load-bearing structure:steel beam reinforced with trusswork; lower orthotropic bridge
length:54 m
weight of the steel structure:180 t
investor:ŘSD in the CR (The Road and Motorway Directorate)
commissioning:2004


load-bearing structure:composite continuous four beams (track system) and two beams (platform); upper bridge deck
length:131 m
weight of the steel structure:522 t
investor:České dráhy (Czech Railways)
commissioning:2004